3D coordination, structured asset data, and construction documentation — delivered for hospitals, universities, data centres, and industrial facilities.
The BIM model is a pre-digital twin of the building — coordinated, clash-free, and constructable before the first beam is set, then handed over as the structured asset model facility teams operate from.
Book a Demo

Complex MEPF — medical gas, vacuum, isolation room pressurisation, backup power routing.
Multi-building campus coordination, shared infrastructure, phased documentation.
Rack layout, cable tray routing, cooling infrastructure MEP coordination.
Manufacturing plants, process buildings, utility infrastructure.
Full BIM for healthcare including medical gas, vacuum, isolation zones, backup power. Clash detection across architectural, structural, MEPF.
BIM coordination across multiple buildings. Phased construction, coordinated MEPF, structured asset data.
Rack layout, cable tray, raised floor, cooling infrastructure. Structured for operational handover and capacity planning.
Production RFA for MEPF components. LOD 100–400, COBie-ready, IFC export. Hosted, face-based, adaptive, nested types.
Navisworks clash detection per BEP. Point cloud to Revit for renovation and retrofit projects.
A Revit BIM consultant produces coordinated 3D models, MEPF clash detection, Revit families, and structured asset data (COBie, IFC) for construction and operations teams. We deliver BIM Level 2 / ISO 19650 compliant projects for hospitals, universities, data centres, and industrial facilities — coordinated and clash-free before construction begins.
Architectural, structural, and MEPF coordination; clash detection in Navisworks per the project BEP; Revit family creation (LOD 100–400); COBie-ready data structuring; Scan-to-BIM for retrofit projects; and full construction documentation (drawings and schedules).
Yes. We have delivered hospital BIM with medical gas, vacuum, isolation room pressurisation, and backup power routing. For data centres we coordinate rack layout, cable tray, raised floor, and cooling infrastructure — structured for operational handover and capacity planning.
Coordinated Revit models, federated Navisworks file with clash report, construction drawings (DWG/PDF), production-quality Revit families (RFA), COBie-ready asset data, and BIM Execution Plan compliance documentation.
Book a demo, send us a brief, or tell us what you're working on.